THE DEVELOPMENT THE AUTOMATIC ACCIDENT ALERT WITH VEHICLE TRACKING SYSTEM USING GSM

Saturday 2 March 2013

WEEK 6 (FYP 2)

TITTLE : ETCHING PROCESS

This week, I continue with etching process. Begin the etching process using a acid liquid to remove copper that is non use for the circuit. After etching process used the sand paper to remove non use copper on the board until only the tracking one is there. The etching process must be completed first before it can install the component on the board using a drill and solder.


Figure 1 : the track on the board after the Iron process

Figure 2 : Etching process using a acid liquid to remove copper

Figure 3: After etching process the acid liquid must be disposed in the right place


copyright by
sh mohd faiz


No comments:

Post a Comment