THE DEVELOPMENT THE AUTOMATIC ACCIDENT ALERT WITH VEHICLE TRACKING SYSTEM USING GSM

Saturday, 16 February 2013

WEEK 5 (FYP 2)

TITTLE : IRON PROCESS

On this week, I continue doing a stick the design with the PCB board with iron. After the design has been printed on a glossy paper cut the excess paper and place it face-down on the PCB with the ink touching the copper plate. The  ironing process must on wood with a layer of newspaper and bond paper. Also the iron  must at MAX before ironing it.

 Figure 1 : Cooper plate

Figure 2 : Schematic Design on OHP paper (Tracing Paper)

Figure 3 : A Clear Schematic Design

Figure 4 : Iron Process


copyright by
sh mohd faiz


Thursday, 7 February 2013

WEEK 4 (FYP 2)

TITTLE :  PRINT THE LAYOUT ON OHP PAPER

The figure 1 below is the picture of the OHP paper and cooper board before it will be print the schematic design on the OHP paper using a laser printer or laser copier. This is the process before we can start  transfer the image to the OHP paper using Iron and start the etching process. Figure 2 is the Layout of the  Automatic Accident Alert that have to print on the OHP Paper.


Figure 1 : Show the OHP paper and the cooper board



Figure : Layout of the OHP paper



copyright by
sh mohd faiz



Wednesday, 30 January 2013

WEEK 3 (FYP 2)

TITTLE : DESIGN THE PCB LAYOUT AND SCHEMATIC PROCESS

For this week, I already start my project by doing a schematic circuit for my project using a PCB layout software. By this software I can make a PCB layout easily by following the schematic circuit that I make for my project.
Figure 1 : Schematic circuit of Automatic Accident Alert System



Figure 2 : Design Layout of Automatic Accident Alert System

copyright by
sh mohd faiz



Wednesday, 23 January 2013

WEEK 2 (FYP 2)

TITTLE : BUYING A COMPONENT

Figure below show that of my Vibration Sensor and smoke detector that I bought at the Electronic Shop. For my proximity sensor, I have to wait for a week to get it because I need to make an order first , before I can get it.

Figure 1 :  Vibration sensor (Right side)

Figure 2 : Vibration Sensor (Upper side)

Figure 3 : Vibration sensor (Front side)




Figure 4 : Smoke Detector (Upper side)


Figure 5 : Smoke Detector (Front side)

Figure 6 : Promixity Sensor that I order
copyright by
sh mohd faiz

Friday, 18 January 2013

WEEK 1 (FYP 2)

TITTLE : BUYING A COMPONENT

In this week, I start buying the other components that needed for me to start the projects, because for the last semester (FYP 1), I have already buy a few components for my project. For me, If I can finish this project earlier,  I have a much time to troubleshoot if something goes wrong with my project before the presentation day and also I can concentrate for the final exam and my project report.


copyright by
sh mohd faiz


Thursday, 8 November 2012

Week 14 (FYP 1)

On this week, I have prepare both of my proposal report and the logbook in my blogspot for submission. All the research that I had done for my project has been concluded in my report proposal and my blogspot. Also on this week I had change my title of project from "Accident Alert with Vehicle Tracking System Using GSM" to The Development of Automatic Accident Alert With Vehicle Tracking System Using GSM".


copyright by
sh mohd faiz

Friday, 2 November 2012

Week 13 (FYP 1)

During this week, I'm do a little preparation to submit the proposal report and the progress report for logbook in my blogspot to my advisor. I had been told, we all the FYP 1's student have to submit our progress report in logbook which giving out 35% mark but for sem 1 only 5% mark for the progress. For our logbook in my blogspot also bring 35% mark but only 10% for sem 1 and both of them must be finished by week 14 so that advisor can key in the resulted data.


copyright by
sh mohd faiz