THE DEVELOPMENT THE AUTOMATIC ACCIDENT ALERT WITH VEHICLE TRACKING SYSTEM USING GSM

Saturday, 9 March 2013

WEEK 7 (FYP 2)

TITTLE : SOLDERING AND ASSEMBLY PROCESS

This show that I am doing a soldering and assembly process for my project Automatic Accident Alert System. Alhamdulillah all the schedule according to my plan and I have much time to do troubleshooting if anything go wrong.

Figure 1 : List of the component for my circuit

Figure 2 : Show the soldering process

Figure 3 : Show the halfway of my project

copyright by
sh mohd faiz

Saturday, 2 March 2013

WEEK 6 (FYP 2)

TITTLE : ETCHING PROCESS

This week, I continue with etching process. Begin the etching process using a acid liquid to remove copper that is non use for the circuit. After etching process used the sand paper to remove non use copper on the board until only the tracking one is there. The etching process must be completed first before it can install the component on the board using a drill and solder.


Figure 1 : the track on the board after the Iron process

Figure 2 : Etching process using a acid liquid to remove copper

Figure 3: After etching process the acid liquid must be disposed in the right place


copyright by
sh mohd faiz


Saturday, 16 February 2013

WEEK 5 (FYP 2)

TITTLE : IRON PROCESS

On this week, I continue doing a stick the design with the PCB board with iron. After the design has been printed on a glossy paper cut the excess paper and place it face-down on the PCB with the ink touching the copper plate. The  ironing process must on wood with a layer of newspaper and bond paper. Also the iron  must at MAX before ironing it.

 Figure 1 : Cooper plate

Figure 2 : Schematic Design on OHP paper (Tracing Paper)

Figure 3 : A Clear Schematic Design

Figure 4 : Iron Process


copyright by
sh mohd faiz


Thursday, 7 February 2013

WEEK 4 (FYP 2)

TITTLE :  PRINT THE LAYOUT ON OHP PAPER

The figure 1 below is the picture of the OHP paper and cooper board before it will be print the schematic design on the OHP paper using a laser printer or laser copier. This is the process before we can start  transfer the image to the OHP paper using Iron and start the etching process. Figure 2 is the Layout of the  Automatic Accident Alert that have to print on the OHP Paper.


Figure 1 : Show the OHP paper and the cooper board



Figure : Layout of the OHP paper



copyright by
sh mohd faiz



Wednesday, 30 January 2013

WEEK 3 (FYP 2)

TITTLE : DESIGN THE PCB LAYOUT AND SCHEMATIC PROCESS

For this week, I already start my project by doing a schematic circuit for my project using a PCB layout software. By this software I can make a PCB layout easily by following the schematic circuit that I make for my project.
Figure 1 : Schematic circuit of Automatic Accident Alert System



Figure 2 : Design Layout of Automatic Accident Alert System

copyright by
sh mohd faiz



Wednesday, 23 January 2013

WEEK 2 (FYP 2)

TITTLE : BUYING A COMPONENT

Figure below show that of my Vibration Sensor and smoke detector that I bought at the Electronic Shop. For my proximity sensor, I have to wait for a week to get it because I need to make an order first , before I can get it.

Figure 1 :  Vibration sensor (Right side)

Figure 2 : Vibration Sensor (Upper side)

Figure 3 : Vibration sensor (Front side)




Figure 4 : Smoke Detector (Upper side)


Figure 5 : Smoke Detector (Front side)

Figure 6 : Promixity Sensor that I order
copyright by
sh mohd faiz

Friday, 18 January 2013

WEEK 1 (FYP 2)

TITTLE : BUYING A COMPONENT

In this week, I start buying the other components that needed for me to start the projects, because for the last semester (FYP 1), I have already buy a few components for my project. For me, If I can finish this project earlier,  I have a much time to troubleshoot if something goes wrong with my project before the presentation day and also I can concentrate for the final exam and my project report.


copyright by
sh mohd faiz